Water penetration was observed to an occupied unit. The water penetration was caused by defective cavity flashing within the southern elevation. The subject elevation is inaccessible without the erection of a safe access structure.
The remedial building works can be summarised as follows:
- Site planning, installation and dismantling of stage scaffolding
- Cavity flashing to the area of water penetration and the cavity flashing to the wall above