Structural Rectification Works

The entrance area to the residential block was structurally unsound and structural issues were identified.

The remedial building works can be summarised as follows:

  • Complete re-construction of entry area including:
    • Installation of structural steel beam to the first floor underslab to safely carry out the entrance area re-construction (removal of load bearing walls)
    • Piers installation to underslab area to avoid reoccurrence of sinking
    • Drainage work repairs
    • Slab re-construction along with structural load bearing reinforced concrete blade wall
    • New intercom system, new wall and floor tiles and new entry door

The remedial works were documented, supervised and certified by Remedial Engineer – Richard Cortis Pty Ltd

View more

Related project

Campbell Parade, Bondi Beach

Façade Upgrade, Renovation Work, Structural Works,

Cowper Street, Parramatta

Cladding Replacement, Façade Upgrade,

177 Clarence Street, Sydney

Façade Upgrade, Landscaping, Renovation Work, Structural Works,